Silent Cell or Firmware Changes That Undo Your Pack Qualification
Which cell, weld, and firmware changes must trigger notice, what a supplier's change control procedure should contain, and what to requalify when it lands.
Which cell, weld, and firmware changes must trigger notice, what a supplier's change control procedure should contain, and what to requalify when it lands.
An RFQ that says only IP67 produces bids you can't compare. Here's the standard, specimen, quantity, and post-test function fields that fix it.
Sealed connectors, gasket labor, leak-test yield, retest NRE, and lost serviceability are the IP67 to IP68 cost drivers. Here is how to normalize two bids.
Specimen identity, agreed test conditions, and accredited lab scope come first. Then production evidence: leak test records, torque control, and a teardown.
What US importers of lithium-ion battery packs must keep after entry, how long, and what to produce when CBP sends a request for information.
Traceability is a bid deliverable, not an assurance. Require bidders to attach a working traceability file to the quote to see who can actually produce one.
A UN 38.3 test summary and a dangerous goods declaration only work if they describe the same battery. Here is how to keep the two documents in agreement.
In a split supply chain, cell reports, pack listings, and market approvals live with different parties. Here is what to put in the RFQ so nobody assumes.
A UN 38.3 test report covers a cell model, not a shipment. How cell lot codes, work orders, and pack serials hold the compliance evidence chain together.
The pack MOQ is set in the PO, not the pilot docs. How sample, pilot, and production pricing bases hand off, and where the forecast becomes binding.