How to Word an IP Requirement So Every Supplier Bids the Same Test
Write the IP line as a test definition: standard, full code, second-digit conditions, and tested configuration — so every supplier quotes the same scope.
The requirement package itself: specification structure, acceptance criteria, interface and drawing control, and revision and change control.
Write the IP line as a test definition: standard, full code, second-digit conditions, and tested configuration — so every supplier quotes the same scope.
Compliance language that belongs in a lithium-ion pack specification before the RFQ: named documents, owners, delivery points, and cell traceability.